| Circular No. | Date | Subject |
| Track |
| 107 | 10/06/2022 | Ensuring quality of work and maintaining site records in works contracts |
| Withdrawal of CE circular 98 | 08/06/2022 | Withdrawal of CE circular 98 |
| 106 | 11/04/2022 | Safety of Track |
| 100 | 22/04/2019 | Guidelines for Cess Repair and Cess widening Work |
| 98 (Revision-I) | 19/02/2014 | (A)Prevention of asset failures by rationalization of frequency of lubrication and inspection. |
| 99 | 24/09/2013 | Minimum Inspection Schedule of P.Way Officials |
| CE''s Circular No. 98 | 15/11/2010 | Prevention of asset failures & Measurement of corrosion of rail foot due to linner biting |
| 97 | 07/05/2010 | Replacement of corroded steel channel sleepers |
| 96 | 18/09/2009 | Laying & Maintenance of CMS Crossings |
| 95 | 04/04/2006 | Joint Sleepers |
| 93 | 08/02/2006 | Competency Certificate- Permit to work |
| 94 | 25/01/2006 | Ballast procurement and its utilization |
| 92 | 13/07/2005 | Quality Control of Track renewwal and other work |
| 91 | 23/03/2005 | Fabrication, Erection, Painting,Inspection & Maintance of Steel Channel Sleepers. |
| 90 | 24/01/2005 | Essential Tools & Fittings to be kept by Keyman Mate & Gateman under his custody. |
| 89 | 12/10/2004 | Concrete Sleepers Track- Maintenance program. |
| 88 | 09/02/2004 | Summer Precaution on Track |
| 87 | 05/09/2002 | Precutions when view is obstructed at the site of maintenance work |
| 86 | 06/08/2002 | Maintenance of loop lines and overshoots in yards wherever speed been increased to 30 kmph |
| 85 | 13/02/2002 | Execution of end croping and welding of Rails |
| 84 | 20/02/2001 | Project Report for Track Renewal Works. |
| 83 | 19/02/2001 | Matallurgical investigation of rail-test pieces in case of rail failure/visual or Ultrasonic detection of rail flaw. |
| 82 | 19/04/2000 | Summer Prections-P.Way. |
| 81 | 03/02/2000 | Provision of flats on check rails of Diamonds |
| 80 | 17/12/1999 | Rail Fractures, Winter Precaution. |
| 78 | 15/12/1993 | Manual laying of pre- stressed Concrete Sleepers. |
| 77 | 08/02/1993 | Analysis of record of OMS-2000Run by PWI,AEN & DEN and documentation of results. |
| 76 | 15/05/1991 | Joint Traffic and Engineering circular for traffic blocks for Engineering works. |
| 75 | 20/02/1991 | Stretches of Track under machine maintenance. |
| 74 | 30/01/1991 | Working of Track Machines on NE Railway-(Divisional/Headquarter Control) |
| 73 | 28/04/1989 | Supply of Ballast/Boulders. |
| 71 | 01/11/1988 | Maintenance of Level Crossing |
| 70 | 18/05/1982 | Extensive casual renewals of unservicable wooden sleeper |
| 69 | 17/02/1982 | Ultrasonic Flaw Detection of Rails |
| Amedement to CE circular 35 | 11/01/1982 | Speed Restriction for Track works |
| 68 | 12/01/1981 | Inspection of Points & Crossing By Signal & Engineering Inspectors |
| 67 | 07/01/1980 | Use of 2 Block RCC Sleepers (MG) In The Yards |
| 66 | 08/03/1978 | Directed Track Maintenance |
| 65 | 10/11/1976 | Level crossing and check rails |
| 64 | 31/12/1973 | Marking of Rail level |
| 63 | 12/04/1972 | Ballast requirement |
| 62 | 15/03/1972 | Accontial of Materials in the custody of PWI |
| 61 | 14/02/1972 | Lubrication of rails |
| 60 | 06/01/1972 | Use of M.S liners |
| 59 | 08/01/1970 | Corresion of rails |
| 58 | 05/09/1969 | Maintenance of level Crossings. |
| 57 | 22/08/1969 | Ramming of cribs and shoulders after packing and alignment correction |
| 56 | 07/03/1969 | Maintenance of Sand Humps |
| 55 | 04/02/1969 | Attention to rail in the vicinity of water column |
| 54 | 08/01/1969 | Cleaning of new Rails |
| 53 | 03/01/1968 | Long Welded Rails |
| 52 | 19/04/1966 | Resurfacing of Points & Crossing by Gas Welding " IN SITU" |
| 51 | 10/03/1966 | Recording and Checking of Gang work |
| Amedement to CE circular 48 | 09/02/1966 | Casual renewals of wooden Track sleepers |
| 48 | 04/01/1966 | Casual renewals of wooden Track sleepers |
| 2 | 01/01/1966 | Diversion of Level Crossing with Extending Loops in the Station Yards |
| 49 | 06/05/1965 | Standard Ballast section & Formation width |
| 47 | 07/04/1965 | Curve Reagister and realingment of curve |
| 46 | 17/03/1965 | Track maintenance. |
| 44 | 02/02/1965 | Preventation of adjustment of creep |
| 43 | 05/01/1965 | Use of non- removeable Keys with Two Key-Type A.C.B plates and Steel Trough Sleepers |
| 40 | 20/02/1964 | Road Test |
| 37 | 06/01/1964 | P way inspection Note book |
| 35 | 13/03/1963 | Relaying of Track |
| 33 | 07/01/1963 | Records of materials under trial |
| 31 | 20/03/1962 | Maintenance of Points & Crossings. |
| 27 | 09/03/1962 | Loading of clams for missing consignments |
| 26 | 06/02/1962 | Accidents at Level Crossing |
| 24 | 09/01/1962 | Memos to be given to Station Masters while Trolly, Motor Trolly, Lorry working without line clear |
| 22 | 04/07/1961 | Scrutiny of P.Way Materials Recived from Firms and acceptatance of the materials |
| 21 | 21/06/1961 | Provision of Dogs Spikes in Track |
| 20 | 12/06/1961 | Inspection & Maintenance of Points & Crossings. |
| 19 | 09/05/1961 | Working of Level Crossing outside Station |
| 18 | 04/04/1961 | Bearing Plates. |
| 17 | 03/03/1961 | Prize distribution for best maintained Gang- Length & best maintained PWI''s- Length. |
| 7 | 01/02/1961 | Scotch Blocks |
| 3 | 02/01/1961 | Use of wooden sleepers in Level Crossing & approaches to Bridges on Metal sleepered sections |
| 1 | 01/01/1960 | Maintenance of Catch & Slip Sidings |
| 4 | 01/01/1959 | Accident - Holding down bolts |
| 6 | 06/01/1958 | All Concered Messages |
| 15 | 01/01/1957 | Opening of new lines in Station Yards etc. |
| Track Machine |
| 79 | 6-1-1994 | Inspection schedule for track Machine |
| 105 | 08.04.2022 | Pre-requisites for deployment of Track Machines (Trampers) on Construction project/other agencies |
| Bridges |
| 1 | 02.06.1988 | Inspection of Important Bridges |
| 2 | 15.09.1988 | Classification & Inspection of Distressed Bridges |
| 3 | 28.12.1988 | Procedure for monitoring compliance of Inspection notes recorded in Bridge Register |
| 4 | 07.02.1989 | Bridge Inspection Schedule |
| 6 | 27.04.1989 | Fixing of Danger Level on Bridges |
| 7 | 02.06.1989 | Minimum opening and stranded spans of new Bridges |
| 8 | 14.09.1989 | Development of proposals for Rebuilding/Rehabilitation of Bridge |
| 9 | 10.01.1990 | Assistance to the bridge inspectors by Divison regarding duties & responsibility and also assistance for painting & greasing of grider bridges upto 12.20 m spans |
| 10 | 13.02.1990 | Afflux - Measurement |
| 2R(1990) | 18.04.1990 | Distressed bridges - Classification |
| 4R(1990) | 18.04.1990 | Bridge Inspection Schedule |
| 11 | 17.01.1991 | Provision of height gauges at the approaches of the road – under – bridge/Subway |
| 12 | 22.06.1995 | Erection of steel structures |
| 13 | 25.01.1996 | Inspection & Maintenance of Bridges |
| 14 | 18.12.2000 | Handing over of section from Construction Organization to open-line after construction of new line & gauge conversion |
| 15 | 15.07.2014 | Temporary speed restriction in connection with Bridge work |
| 16 | 12.11.2014 | Inspection of road over bridges |
| Works |
| 72 | 1980 | Arbitration demand-Processing |
| 101 | 29.01.2020 | System improvement to prevent contract variations |
| 102 | 08.10.2021 | Inspection & Maintenance of Buildings, Staff Quarters and other Structures |
| Land |
| 103 | 22.03.2022 | Guidelines for approval of Engineering Drawings |
| 104 | 22.03.2022 | Guidelines for Construction of Boundary Wall on Railway Land |
| Other Important Instruction |
| w/275/o/A/Gen/Pt-VIII/4A | 25/09/2023 | Winter precaution to prevent rail / weld failure- Safety of Track |
| W/26/0/Ballast Policy/Pt-II/4A | 30/08/2023 | NER Joint Procedure Order for unloading of ballast DMT |
| JPO N/563/2/10/(B) pt I | 23/08/2022 | JPO no. 1/2022(Signal) for inspection of Glued Joints |
| W/275/A/Track Policy/Pt-IX/4A | 08/02/2022 | Maintenance of Track on Ballasted Track Bridges & Approaches (Deep Screening) |
| W/275/A/Track Policy/Pt-IX/4A | 08/02/2022 | JPO for providing Safety gadgets for working in electrified territory at Engg LC gates |
| W/29/0/Bridge Policy/5 | 07/02/2022 | Irrigation drains across Railway Track |
| W/29/0/A/Pt.IV/5 | 10/01/2022 | Provision of cover plates over cross girders of OWG |
| W/29/0/Bridge Policy/5 | 29/10/2021 | Pipe line crossing/Irrigation drains-classification, maintenance & their extension |
| DO No W/26/0/Ballast Policy/Pt-II/W-4A | 16/10/2020 | Unloading of Ballast DMT |
| SWR | 16/11/2017 | Guideline for BOBYN unloading |